)]}'
{"doc/source/process.rst":[{"author":{"_account_id":6802,"name":"Joel Coffman","email":"jmc7tp@gmail.com","username":"joel-coffman"},"change_message_id":"b6060cc1b12bbb4cbf79050204b7e4ea7cf477e8","unresolved":false,"context_lines":[{"line_number":139,"context_line":"For newton, we are not aligning the Non-priority Feature Freeze with"},{"line_number":140,"context_line":"the tagging of newton-2. That means the newton-2 tag will not include"},{"line_number":141,"context_line":"some features that merge later in the week. This means, we only require"},{"line_number":142,"context_line":"the code to be approved before the end of Feburary 26th, we don\u0027t require it"},{"line_number":143,"context_line":"to be merged by that date. This should help stop any gate issues"},{"line_number":144,"context_line":"disrupting our ability to merge all the code that we have managed to get"},{"line_number":145,"context_line":"reviewed in time. Ideally all code should be merged by the end of July"}],"source_content_type":"text/x-rst","patch_set":2,"id":"dada55a8_0fe065f9","line":142,"updated":"2016-07-20 16:39:09.000000000","message":"Looks like this date is from the Mitaka development cycle rather than Newton.","commit_id":"f419945dfb09652717968dd88e7f9a32c5e10196"},{"author":{"_account_id":6802,"name":"Joel Coffman","email":"jmc7tp@gmail.com","username":"joel-coffman"},"change_message_id":"b6060cc1b12bbb4cbf79050204b7e4ea7cf477e8","unresolved":false,"context_lines":[{"line_number":235,"context_line":"-  instead, just accept the idea of untranslated strings being better"},{"line_number":236,"context_line":"   than no strings in those cases"},{"line_number":237,"context_line":""},{"line_number":238,"context_line":"So for Newton, 12st September, so we will call 12st September the hard"},{"line_number":239,"context_line":"freeze date, as we expect RC1 to be cut sometime after 12st September."},{"line_number":240,"context_line":"Note the date is fixed, it\u0027s not aligned with the cutting of RC1."},{"line_number":241,"context_line":""}],"source_content_type":"text/x-rst","patch_set":2,"id":"dada55a8_0f850506","line":238,"updated":"2016-07-20 16:39:09.000000000","message":"typos: 12st -\u003e 12th","commit_id":"f419945dfb09652717968dd88e7f9a32c5e10196"},{"author":{"_account_id":6802,"name":"Joel Coffman","email":"jmc7tp@gmail.com","username":"joel-coffman"},"change_message_id":"b6060cc1b12bbb4cbf79050204b7e4ea7cf477e8","unresolved":false,"context_lines":[{"line_number":236,"context_line":"   than no strings in those cases"},{"line_number":237,"context_line":""},{"line_number":238,"context_line":"So for Newton, 12st September, so we will call 12st September the hard"},{"line_number":239,"context_line":"freeze date, as we expect RC1 to be cut sometime after 12st September."},{"line_number":240,"context_line":"Note the date is fixed, it\u0027s not aligned with the cutting of RC1."},{"line_number":241,"context_line":""},{"line_number":242,"context_line":"This means we must cut another tarball (RC2 or higher) at some point"}],"source_content_type":"text/x-rst","patch_set":2,"id":"dada55a8_af74b935","line":239,"updated":"2016-07-20 16:39:09.000000000","message":"ditto","commit_id":"f419945dfb09652717968dd88e7f9a32c5e10196"}]}
